Skip to main content
Portland & area concrete contractor · Free written estimates
(503) 564-7833

Manufacturing · ESD

Static-Dissipative ESD Flooring for Portland Electronics

When sensitive electronics sit on a floor where static charge builds up, component failure is inevitable. A properly engineered ESD floor system dissipates that charge safely to ground before it reaches the assembly line. Portland Concrete installs and verifies static-dissipative concrete flooring for electronics manufacturing, component clean rooms, and precision assembly zones across Portland. Every install includes megohmmeter verification and resistance documentation.

  • Megohmmeter verified
  • Grounded to building electrical
  • Free written estimate, firm schedule

The ESD specification

Why ESD Flooring Requires a Narrow Resistance Window

Static electricity on a manufacturing floor is not a binary problem. A floor that is too conductive creates electrical hazards; one that is too insulating lets charge accumulate until it jumps to a component. The solution is a dissipative floor, one that sits in a specific resistance range and bleeds charge to ground at a controlled rate.

We install ESD systems engineered to the ANSI/ESD standard your facility operates under. After the epoxy cures, the floor is tested with a megohmmeter at multiple points to confirm the resistance falls within spec. That verification report becomes part of your compliance documentation and audit trail.

The system holds its resistance for years if maintained with ESD-compatible cleaners. Coordinate the install with your electrical contractor on the grounding scheme, and with our chemical-resistant flooring work in adjacent zones. See also our heavy-duty manufacturing floors and dust-proof sealing for other facility zones.

Recent work
ESD-dissipative epoxy floor in a Portland electronics assembly facility
Copper ground strip installation during ESD floor prep

Installation sequence

How Portland Concrete Installs ESD Flooring Systems

  1. Identify the ESD standard

    We work with your engineering and safety teams to confirm which ANSI/ESD standard applies, the target resistance range, and how the floor ties into the building electrical ground.

  2. Prepare slab and embed grounds

    The concrete slab is diamond-ground to the system profile. Copper ground strips are set at the engineered spacing and connected to the building electrical ground at designated points.

  3. Apply ESD epoxy system

    The matched ESD-dissipative epoxy (primer, body coat, topcoat) is installed with conductive elements at the right loading to achieve the target resistance range.

  4. Test and document

    After cure, the floor is tested with a megohmmeter across multiple zones. Resistance readings are documented and handed off to your facility for ongoing compliance and recertification.

The critical step

Megohmmeter Verification Confirms the System Works

An ESD floor that looks correct but does not meet the resistance spec is worse than useless. We verify every install with a megohmmeter, testing at multiple points across the finished floor to confirm the resistance falls within the ANSI/ESD window. That verification report is your proof of compliance.

The grounding scheme is coordinated with your electrical contractor. We work with adjacent manufacturing floor systems so each zone operates independently. For broader industrial concrete work in the same facility, we integrate ESD zones cleanly with standard flooring, loading docks, and other site concrete.

Quote ESD flooring
Megohmmeter testing ESD floor resistance after installation
Tested Resistance verified
Grounded To building electrical
Free Written estimate

Common questions

ESD Flooring Questions, Answered

Resistance ranges, grounding, verification and which manufacturing zones need ESD.

With a megohmmeter (high-resistance ohmmeter) at multiple test points across the floor, comparing to the ANSI/ESD standard's specified range. The reading needs to fall inside the dissipative window, not too low (conductive) or too high (insulating).
Only zones where ESD-sensitive components are handled. Electronics assembly, clean rooms, repair benches, certain pharmaceutical processes. The rest of the facility uses standard manufacturing flooring. We define the zones with you and your safety/engineering team.
Copper ground strips embedded in the floor at the engineered spacing connect to the building electrical ground at designated points. The electrical contractor coordinates with us on the connections and verifies the grounding scheme.
Many years with proper maintenance. ESD-compatible cleaning chemicals preserve the system; standard wax or solvent-based cleaners can compromise the resistance range. The maintenance protocol is part of project handoff and includes recertification cadence.
Similar to other epoxy systems plus the grounding install and verification steps. A typical zone takes a week to install and verify; multi-zone facilities stretch to several weeks with phased install. The schedule is in the quote.

Client reviews

What Portland Operations Say About Their ESD Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.

Z. X4
Electronics Plant Manager, Portland
★★★★★

They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.

Y. X4
Production Engineer, Vancouver
★★★★★

Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.

Q. X4
Clean Room Operations, Hillsboro
★★★★★

Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.

X. X4
Manufacturing Director, Gresham

Ready to start

Get a Free ESD Flooring Quote

Share your ANSI/ESD standard, the zones requiring coverage, and your operating schedule. We will spec the system, quote the install with verification, and provide a firm timeline.

We'll assess the facility and send a written quote within one business day.