Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
BASF · MasterTop
Industrial Epoxy & Urethane Concrete Floors Built for Portland Facilities
When a warehouse, manufacturing plant, or food processing facility needs a floor system engineered for the actual work happening on it, MasterTop delivers. We install the full BASF MasterTop range: standard epoxy for moderate traffic, high-build systems for heavy use, urethane cement for chemical and thermal extremes. Every installation follows BASF spec to earn the system warranty.
- Full BASF MasterTop range
- Spec-matched to facility use
- System warranty on every install
System selection
Choosing the Right MasterTop Floor System
Not every facility floor needs the same coating. A distribution center with steady forklift traffic has different demands than a chemical processing plant or a frozen-food warehouse. MasterTop spans the range: epoxy toppings for light-to-moderate use, reinforced epoxy for heavy traffic, urethane cement for aggressive chemical or thermal exposure, and decorative systems for retail showrooms.
The selection process starts on-site. We evaluate traffic patterns, chemical exposure, temperature swings, slip requirements, and any aesthetic goals. From there, the matched MasterTop system is specified, and the slab prep is tailored to that system's requirements. This matching is what separates a floor that performs from one that fails early.
Our chemical-resistant flooring work often uses MasterTop urethane cement. For freezer floor applications, we coordinate thermal cycling specs. See our broader industrial concrete services for context on how MasterTop fits into the larger facility scope.
Installation sequence
How MasterTop Installation Unfolds in Portland
-
Assess facility and select system
We walk the space, document traffic patterns, chemical exposure, temperature conditions, and any slip or aesthetic needs. The matched MasterTop system is selected from the BASF range and quoted in writing.
-
Prepare slab to system spec
The concrete slab is diamond-ground to the profile required by the chosen MasterTop system, contaminants removed, cracks repaired with BASF-compatible materials, and the surface primed with the matched primer coat.
-
Apply MasterTop layers
The system is applied in sequence: primer, body coat, aggregate broadcast where specified, and topcoat at engineered thickness. Each layer cures per BASF schedule before the next is applied.
-
Document and hand off
Material batch records, application thickness logs, and cure documentation are compiled for BASF system warranty support. The floor is handed off with maintenance protocol and warranty paperwork in place.
Warranty value
Why BASF-Spec Installation Matters for Warranty
A product warranty covers the material. A system warranty covers the material plus the installation. MasterTop system warranty is only valid when installed by a BASF-certified installer following BASF spec on prep, primer, application thickness, and cure schedule. Cutting corners on any step voids the warranty. We follow the protocol because that is what makes the warranty real and protects your facility investment.
Coordinate with MasterSeal waterproofing if substrate moisture is a concern, and our warehouse flooring services for the full scope of your facility floor project.
Related BASF products
Pair MasterTop with Other BASF Systems
MasterTop is one of three BASF services we install. Explore the others.
Frequently asked
MasterTop Questions Answered
System selection, facility matching, warranty coverage, and BASF spec compliance.
MasterTop urethane cement in our chemical exposure zone. Three years of operation, no degradation, BASF warranty in our file. The brand discipline pays off.
High-build MasterTop across our warehouse zones. Forklift traffic for two years, no spalling at the joints, no surface wear. Right system for the use.
BASF-spec install with documentation. The system warranty paperwork came at handoff, supporting our facility records and any future audit need.
They matched the MasterTop system per zone in our multi-use facility instead of one system everywhere. Better outcomes, smaller total cost. Real engineering match.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Portland.
Next step
Get Your MasterTop Floor Quote
Describe your facility use, zone layout, and any specialty requirements. We will spec the matched MasterTop system and send a written quote with schedule.
Written quote delivered within one business day of site assessment.